Sport building
Wokingham, United Kingdom
An 18.5x38x7.6m facility was completed in 2024 as a training center for cricket players at the Dan Housego Cricket Centre. The construction required the removal of sixty dump truck loads of soil and the erection of a retaining wall to preserve parking near the administrative part of the facility. In these challenging geotechnical conditions, our engineers worked closely with British architects to ensure proper waterproofing of the structure and seamless, two-level access between buildings. Inside the facility, a mezzanine was constructed for visitors wishing to observe the progress of aspiring cricket players.